Air and water pollution laws require industries to take permission from the state pollution control board (or pollution control committee in union territories) before setting up and before starting operations. This guide explains when a business needs pollution control board consent.

The two consents

ConsentWhenPurpose
Consent to establish (CTE)Before construction or setting up the unitChecks the site, process and planned pollution controls
Consent to operate (CTO)Before starting production, and on renewalConfirms controls are installed and sets operating conditions

Both are issued under the Water (Prevention and Control of Pollution) Act, 1974 and the Air (Prevention and Control of Pollution) Act, 1981.

Categories of industry

  • Red: high pollution potential; strictest conditions and shorter consent validity
  • Orange: medium pollution potential
  • Green: low pollution potential; simpler process
  • White: practically non-polluting; exempt from consent

The category depends on the activity, based on lists issued by the Central Pollution Control Board and adopted by state boards. Check your activity in your state board's list.

Recent relief

  • Under notifications issued in November 2024, white category industries are exempt from CTE and CTO, and an industry that already has an environmental clearance does not need a separate CTE.
  • The list of white category activities was expanded by later notifications. State boards may require white units to intimate them about their operations.

Process

  1. Identify the category of your activity in the state board's list.
  2. Apply for CTE on the state board's online portal before setting up, with the site plan, process description, raw materials, water use, effluent and emission details and proposed controls.
  3. Pay the fee, usually based on capital investment and category.
  4. Install the controls required, such as effluent treatment or air pollution control equipment.
  5. Apply for CTO before starting production; the board may inspect.
  6. Comply with conditions, file returns, and renew the CTO before expiry.
  • Environmental clearance for projects listed in the EIA notification
  • Authorisation under hazardous waste, biomedical waste or e-waste rules
  • Registration under plastic waste rules for producers, importers and brand owners
  • Groundwater permission where groundwater is drawn above limits

Related reading: factory licence under the OSH Code and the business licences checklist. Our industry licences team can identify your category and handle applications.

This article gives general information under the Water and Air Acts and related notifications as on the date shown. Categories and procedures differ by state board.