Key takeaways
- Under the OSH Code, a factory is premises with a manufacturing process employing 20 or more workers with power, or 40 or more without power.
- Those thresholds are double the old Factories Act limits of 10 and 20.
- Factories need a licence, and establishments with 10 or more workers need registration under the Code; the procedure is set by each state's rules.
- Licensed factories must meet safety, health, welfare and working-hour requirements and keep records.
For decades, factory licensing in India ran under the Factories Act, 1948. From 21 November 2025, it is governed by the Occupational Safety, Health and Working Conditions Code, 2020 (the OSH Code), which also changed who counts as a factory. This guide explains the factory licence in India under the new law.
What counts as a factory now
| Manufacturing process | OSH Code | Old Factories Act |
|---|---|---|
| With the aid of power | 20 or more workers | 10 or more workers |
| Without the aid of power | 40 or more workers | 20 or more workers |
The government can also declare specific premises to be a factory, whatever the number of workers, for hazardous processes. Smaller units may still be establishments that must register under the Code if they employ 10 or more workers.
Licence and registration
- Registration: establishments covered by the Code register electronically with the authority the state appoints.
- Factory licence: premises that meet the factory definition need a licence before starting manufacturing.
- Plan approval: many states require factory building plans to be approved before construction or before the licence.
- State rules: forms, fees, validity and renewal are set by each state's rules under the Code.
Documents usually needed
- Application with details of the occupier, manager, manufacturing process and maximum workers
- Proof of ownership or tenancy of the premises
- Approved site and building plans, where required
- Details of machinery and installed power
- Fire safety approval and pollution control consent, where applicable
- Stability certificate of the building from a competent person, where required
- Incorporation documents of the business
Steps
- Check whether your unit meets the factory definition, and whether the process is notified as hazardous.
- Get plan approval if your state requires it.
- Obtain prerequisite approvals: pollution consent, fire safety and local permissions.
- Apply on the state portal with documents and fee.
- Prepare for inspection, and display the licence at the factory.
Duties after licensing
- Safety measures for machinery, electrical systems, fire and hazardous substances
- Health and welfare facilities: drinking water, toilets, first aid, canteen and creches above set numbers
- Working hours, overtime and leave as the Code provides
- Annual health check-ups for workers as prescribed
- Registers, returns and reporting of accidents
Related reading: pollution control board consent, EPFO and ESIC registration and the business licences checklist. Our industry licences team can check your state's requirements and apply.
This article gives general information under the OSH Code 2020 as on the date shown. State rules decide forms, fees and procedures; check your state's current rules.
Frequently asked questions
When did the OSH Code take effect?
The Occupational Safety, Health and Working Conditions Code, 2020 came into force on 21 November 2025, along with the other labour codes, replacing the Factories Act, 1948 and other laws.
My unit has 15 workers using power. Is it a factory?
Under the new definition, generally not, since the threshold with power is 20 workers. But it may still be an establishment that must register under the Code, and the government can notify specific premises as factories.
Who issues the factory licence?
The factories or labour department of the state, under the state's rules made under the Code, usually through the state's single-window portal.
Do I need approval of the building plan?
Many states require approval of the factory building plans before construction or before the licence. Check your state's rules early.